[adrotate banner="46"]
[URIS id=15686]

Hwange Power Station catches fire

[adrotate group="8"]

 

[adrotate banner="46"]

Energy and Power Development Minister Zhemu Soda said the fire broke out between 5pm and 6pm. He said Zesa executive chairman Dr. Sydney Gata informed him about the incident which forced the power utility to effect temporary load shedding last night.

Post published in: Featured

Source

[adrotate group="8"]
Show More

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button